7.23 • Major Heat • Peak Summer

7.23 • Major Heat • Peak Summer

All things glow in sweltering heat,Cool pure wind comes naturally.

Jul.23 | The Great Heat comes, midsummer is in full swing

Cicadas chirp in the height of summer. Under persistent high temperature, the standby generator sets of large-scale intelligent computing centers and data centers run at full load for a long time. The emission concentrations of original NOₓ and black smoke rise sharply, bringing greater pressure on EIA (Environmental Impact Assessment) acceptance.
Green Valley Environmental Protection’s integrated SCR denitrification + DPF dust removal equipment is custom-designed for high-power diesel generator units:
  1. Long-term high temperature resistance, perfectly adaptable to exhaust working conditions of large generator sets;
  2. DPF particulate matter trapping efficiency ≥95%, meeting the requirement of Ringelmann smoke density Grade 1 or below;
  3. Stable and sustained denitrification performance with ammonia slip ≤3 ppm. Flue gas emission indicators surpass domestic ultra-low emission control standards and Comply with international emission standards.
  4. Equipped with intelligent bypass protection module, supporting long-term continuous operation of generator units, ideal for year-round uninterrupted standby application scenarios.
  5. Heat waves cannot shake our professionalism; high temperatures testify to our reliability.
  6.  Green Valley delivers one-stop customized exhaust retrofit for data & computing center standby gensets.

Post time: Jul-23-2026